Mesrs Darby Leigh and addressed me a letter informing them that they were proceeding with the works, to which I replied informing them that the plans were under consideration and that the works being exceptional structures required special approval (copies of letter attached).

8. Copies of correspondence respecting the storage and transport of Petroleum in the City of London, Strait Settlements, Fort St George, Ceylon, and Singapore, as well as a copy of the correspondence respecting the passage of Petroleum through the Suez Canal presented to both Houses of Parliament by command of Her Majesty June 1892 were obtained.

9. These papers were referred to the Honourable the Acting Attorney General, the Harbour Master, the Government Analyst, and myself who after consultation submitted in October draft conditions to attach to the license (Corr. 103) and draft regulations for the transport of petroleum, copies of which were sent to Messrs. Arnhold Karberg & Co in the same month.

10. The plans for the construction of the necessary tanks and other works on Kowloon Marine Lot 32 were after amendment formally approved on the 12th December 1892.

11. Messrs Arnhold Karberg & Co had in the meantime proceeded with the construction of works and both their representatives Mr. Innes and Dr. Brang...

Page 5

...


Edit History

2026-05-26 21:50:06 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Mesrs Darby Leigh and addressed me a letter informing them that they were proceeding with the works, to which I replied informing them that the plans were under consideration and that the works being exceptional structures required special approval (copies of letter attached). 8. Copies of correspondence respecting the storage and transport of Petroleum in the City of London, Strait Settlements, Fort St George, Ceylon, and Singapore, as well as a copy of the correspondence respecting the passage of Petroleum through the Suez Canal presented to both Houses of Parliament by command of Her Majesty June 1892 were obtained. 9. These papers were referred to the Honourable the Acting Attorney General, the Harbour Master, the Government Analyst, and myself who after consultation submitted in October draft conditions to attach to the license (Corr. 103) and draft regulations for the transport of petroleum, copies of which were sent to Messrs. Arnhold Karberg & Co in the same month. 10. The plans for the construction of the necessary tanks and other works on Kowloon Marine Lot 32 were after amendment formally approved on the 12th December 1892. 11. Messrs Arnhold Karberg & Co had in the meantime proceeded with the construction of works and both their representatives Mr. Innes and Dr. Brang... Page 5 ...
Baseline (Original)
ing Mesers Darby Leigh and addressed me a they wverc and Grange letter informing eeding with the works, to which I replied inform. them that the plans were under consideration and that the works. being exceptional structures required special approval, (copies of letter attached). 8. Copies of respecting the storage the conditions. and Kansport of Petroleum in the City of Londow, Strait dettements, Fort St Ceorge Cylon and Singapore as well as respecting in buck a were obtained copy of the correspondence the passage of Petroleum through the Suez Canal presented to both Houses of Parlia_ ment by command of Her Ma- Jesty June 1892. 9. These papers were referred to the Honourable the Acting Attorney 103) attorney General, the Harbour Master, the Government Analyst and myself who after consultation submitted in october draft. ditions to attach to the license. corr. and draft regulations for the- transport of petroleum copies of which were sent to Messrs. Arnhold Kas & Co in the Karberg same mouth. 10. The plans for the construction of the necessary- tanks ledo and other wort son. Kowloon Marine Lot 32 were -after amendment formally the 12th December. approved or i 1892. 11. Messrs Arnhold rarberg Ce had In the meantine. proceed.. with the construction of works and both their re repro- sentatives Mr. Inister and dr Brang خون کے TITT 5 į
2026-05-26 21:50:06 · Baseline
View content

ing

Mesers Darby Leigh and

addressed me a

they

wverc

and Grange letter informing

eeding with the

works, to which I replied inform.

them that the plans

were

under consideration and that

the works.

being exceptional

structures required special approval,

(copies of letter attached).

8.

Copies of

respecting the storage

the conditions.

and Kansport

of Petroleum in the City of Londow,

Strait dettements,

Fort St Ceorge

Cylon and Singapore

as well as

respecting

in buck

a

were obtained

copy of the correspondence the passage of Petroleum through

the

Suez

Canal

presented to both Houses of Parlia_

ment by

command of Her Ma-

Jesty June 1892.

9.

These papers were

referred to the Honourable the Acting

Attorney

103)

attorney General, the Harbour Master, the Government Analyst and myself who after consultation submitted in october draft. ditions to attach to the license.

corr.

and draft regulations for the- transport of petroleum copies of

which were sent to Messrs. Arnhold Kas & Co in the

Karberg

same mouth.

10.

The plans for the

construction

of

the

necessary-

tanks ledo and other wort son.

Kowloon Marine Lot 32 were -after amendment formally

the 12th December.

approved

or i

1892.

11.

Messrs Arnhold

rarberg

Ce had

In the meantine.

proceed.. with the construction of works and both their re

repro-

sentatives Mr. Inister and dr

Brang

خون کے

TITT

5

į

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.